Meta Mason County
Meta · Mason County hyperscale campus
- Planned IT
- —
- Remaining
- —
- $ / kW·mo
- $76
- White space
- —
Power
Power cost
$76/kW·mo
8¢ industrial · 10.4¢ after PUE —
- Per MW·year
- $911k
- This site
- —
2.5× the cheapest market (Iceland Landsvirkjun).
US industrial · utility tariff × PUE, not colo list price.
- Redundancy
- —
- Opened
- —
- Renewable match
- —
- Rack density
- —
- Voltage
- —
- PUE
- —1.00 ideal · 1.60 typical
- Power source
- —
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
—
H100-eq
—
WUE
0.18 L/kWh
fleet avg · 2023
Operator fleet average applied to this hall — not a site meter. Meta fleet (0014 convention).
Cooling design not published by the operator for this site; typed air as the neutral default.
Network carriers
0No on-net carriers published.
On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
0No public-cloud on-ramp published.
Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Maysville, Kentucky, United States
38.641°, -83.744° · North America
Tenants / users
Meta
Notes
Mason County Fiscal Court unanimously approved a resolution to proceed with a hyperscale data center contracting with Meta on Oct 13 2026; more than 2,000 acres zoned, initial investment about USD 15B per the county's attorney, 40-year multi-phase plan, initial construction expected within three years. Capacity not published. Coordinates: Maysville town center (approximate). Source: https://www.wkyt.com/2026/10/14/mason-county-approves-hyperscale-data-center-deal-with-meta/
Compiled from public filings, operator pages, and reporting. Not an official operator specification.