Meta Fort Worth
Meta
- Planned IT
- —
- Remaining
- —
- $ / kW·mo
- $63
- White space
- —
Power
Power cost
$63/kW·mo
6.6¢ industrial · 8.6¢ after PUE —
- Per MW·year
- $752k
- This site
- —
2.1× the cheapest market (Iceland Landsvirkjun).
ERCOT North · utility tariff × PUE, not colo list price.
- Redundancy
- —
- Opened
- —
- Renewable match
- 100%
- Rack density
- —
- Voltage
- —
- PUE
- —1.00 ideal · 1.60 typical
- Power source
- Multiple utility partners (per Meta). Meta matches 100% of electricity with clean and renewable energy.
Cooling
Plant
Evaporative
Liquid
Not deployed
Rack density
—
H100-eq
—
WUE
0.18 L/kWh
fleet avg · 2023
Operator fleet average applied to this hall — not a site meter. Meta 2023 Sustainability Report.
Meta info sheet: cooling technology significantly more water-efficient than the industry standard. Typed evaporative to match Meta's outside-air / evaporative fleet design used for other Meta halls in this catalog.
Network carriers
0No on-net carriers published.
On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
0No public-cloud on-ramp published.
Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Fort Worth, Texas, United States
32.753°, -97.333° · North America
Tenants / users
Meta
Notes
Broke ground 2015; investment USD 1.5B+ (Meta). Operational per Meta's info sheet. Capacity not published. Coordinates: OSM relation 115274 (place centroid, approximate). Sources: https://datacenters.atmeta.com/all-locations/ ; https://datacenters.atmeta.com/asset/fort-worth-data-center-info-sheet/
Compiled from public filings, operator pages, and reporting. Not an official operator specification.