Operational
Hyperscale
Air cooled

Meta Eagle Mountain

Meta

Planned IT
—
Remaining
—
$ / kW·mo
$65
White space
—

Power

IT live—
Remaining—
Utility feed—
Campus / planned—

Power cost

$65/kW·mo

6.8¢ industrial · 8.8¢ after PUE —

Per MW·year
$774k
This site
—
3.2¢ cheapdear 22.4¢

2.1× the cheapest market (Iceland Landsvirkjun).

Rocky Mountain Power · utility tariff × PUE, not colo list price.

Redundancy
—
Opened
—
Renewable match
100%
Rack density
—
Voltage
—
PUE
—1.00 ideal · 1.60 typical
Power source
Rocky Mountain Power (utility partner named by Meta). Meta matches 100% of electricity with clean and renewable energy.

Cooling

Plant

Evaporative

Liquid

Not deployed

Rack density

—

H100-eq

—

WUE

0.18 L/kWh

fleet avg · 2023

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Meta 2023 Sustainability Report.

Meta info sheet: cooling technology significantly more water-efficient than the industry standard. Typed evaporative to match Meta's outside-air / evaporative fleet design used for other Meta halls in this catalog.

Network carriers

0

No on-net carriers published.

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

0

No public-cloud on-ramp published.

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Eagle Mountain, Utah, United States

Eagle Mountain, Utah County, UT 84005

40.269°, -112.018° · North America

Tenants / users

Meta

Notes

Broke ground 2018; investment USD 3B+ (Meta). Operational per Meta's info sheet. Capacity not published. Coordinates: OSM way 1035123482 (facility footprint). Sources: https://datacenters.atmeta.com/all-locations/ ; https://datacenters.atmeta.com/asset/eagle-mountain-data-center-sheet/

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.