Under construction
Hyperscale
Liquid cooling

Meta Aiken

Meta

Planned IT
—
Remaining
—
$ / kW·mo
$72
White space
—

Power

IT live—
Remaining—
Utility feed—
Campus / planned—

Power cost

$72/kW·mo

7.6¢ industrial · 9.9¢ after PUE —

Per MW·year
$865k
This site
—
3.2¢ cheapdear 22.4¢

2.4× the cheapest market (Iceland Landsvirkjun).

Duke / Santee Cooper · utility tariff × PUE, not colo list price.

Redundancy
—
Opened
—
Renewable match
100%
Rack density
—
Voltage
—
PUE
—1.00 ideal · 1.60 typical
Power source
Aiken Electric Cooperative (utility partner named by Meta). Meta matches 100% of electricity with clean and renewable energy.

Cooling

Plant

Closed-loop liquid

Liquid

Deployed

Rack density

—

H100-eq

—

WUE

0.18 L/kWh

fleet avg · 2023

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Meta 2023 Sustainability Report.

Meta info sheet: efficient closed-loop, liquid-cooled system using zero operational water (or zero water most of the year).

Network carriers

0

No on-net carriers published.

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

0

No public-cloud on-ramp published.

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Aiken, South Carolina, United States

Aiken County, South Carolina

33.642°, -81.844° · North America

Tenants / users

Meta

Notes

Broke ground 2024; investment USD 800M+ (Meta). Meta's info sheet describes it as future (will be part of the fleet); status set to construction. Capacity not published. Coordinates: OSM way 1312295357 (facility footprint). Sources: https://datacenters.atmeta.com/all-locations/ ; https://datacenters.atmeta.com/asset/aiken-data-center-info-sheet/

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.