Planned
Colocation
Liquid cooling
Tier III

Merlin Navalmoral Campus

Merlin Properties · Navalmoral de la Mata

Planned IT
1.4 GW
Free to lease
1.4 GW
$ / kW·mo
$102
White space
2.8M ft²

Inventory

0% occupied

Power

1.4 GWlive

1.4 GW to lease · 0 MW in use

White space

2.8M ft²total

2.8M ft² free · occupied

260k m² · 260k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease1.4 GW
Utility feed
Campus / planned1.4 GW

Power cost

$102/kW·mo

12.2¢ industrial · 14¢ after PUE 1.15

Per MW·year
$1.2M
This site · 1.4 GW
$1.7B/yr
80 kW rack
$8,194/mo
3.2¢ cheapdear 22.4¢

3.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $1.3B/yr less.

Spain industrial · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2030
Renewable match
100%
Rack density
80 kW
PUE
1.151.00 ideal · 1.60 typical
Power source
Extremadura renewables — solar and hydro corridor.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

80 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Campus-scale liquid-ready AI factory. One of Spain's largest announced single sites.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Navalmoral de la Mata, Extremadura, Spain

Navalmoral de la Mata, Cáceres

39.893°, -5.540° · Europe

Tenants / users

Hyperscale pipeline

Notes

1.4 GW announced Merlin campus in Extremadura. Early-stage; grid and permitting still in flight.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.