Expanding
Colocation
Liquid cooling
Tier III

Merlin Edged Getafe I

Merlin Properties / Edged · Madrid South

IT live
16 MW
Free to lease
5.0 MW
$ / kW·mo
$107
White space
50k ft²

Inventory

69% occupied

Power

16 MWlive

5.0 MW to lease · 11.0 MW in use

White space

50k ft²total

16k ft² free · 34k ft² occupied

4,645 m² · 1,463 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live16 MW
Free to lease5.0 MW
Utility feed25 MW
Campus / planned20 MW

About 9 MW of the utility feed is cooling, conversion, and house load.

Power cost

$107/kW·mo

12.2¢ industrial · 14.6¢ after PUE 1.20

Per MW·year
$1.3M
This site · 16 MW
$21M/yr
30 kW rack
$3,206/mo
3.2¢ cheapdear 22.4¢

3.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $15M/yr less.

Spain industrial · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2026
Renewable match
90%
Rack density
30 kW
Voltage
PUE
1.201.00 ideal · 1.60 typical
Power source
Redeia south Madrid.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

30 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

AI colo, 100% pre-leased. Getafe II is 48 MW IT for H2 2029.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Getafe, Madrid, Spain

Getafe, Madrid

40.305°, -3.731° · Europe

Tenants / users

Hyperscale (pre-leased)

Notes

Getafe I delivering 20 MW IT by October 2026. Getafe II 48 MW in the pipeline.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.