Merlin Edged Getafe I
Merlin Properties / Edged · Madrid South
- IT live
- 16 MW
- Free to lease
- 5.0 MW
- $ / kW·mo
- $107
- White space
- 50k ft²
Inventory
69% occupiedPower
16 MWlive
5.0 MW to lease · 11.0 MW in use
White space
50k ft²total
16k ft² free · 34k ft² occupied
4,645 m² · 1,463 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 9 MW of the utility feed is cooling, conversion, and house load.
Power cost
$107/kW·mo
12.2¢ industrial · 14.6¢ after PUE 1.20
- Per MW·year
- $1.3M
- This site · 16 MW
- $21M/yr
- 30 kW rack
- $3,206/mo
3.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $15M/yr less.
Spain industrial · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2026
- Renewable match
- 90%
- Rack density
- 30 kW
- PUE
- 1.201.00 ideal · 1.60 typical
- Power source
- Redeia south Madrid.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
30 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
AI colo, 100% pre-leased. Getafe II is 48 MW IT for H2 2029.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Getafe, Madrid, Spain
Getafe, Madrid
40.305°, -3.731° · Europe
Tenants / users
Hyperscale (pre-leased)
Notes
Getafe I delivering 20 MW IT by October 2026. Getafe II 48 MW in the pipeline.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.