MC Digital Realty NRT14
MC Digital Realty · NRT Inzai
- IT live
- 25 MW
- Free to lease
- 2.5 MW
- $ / kW·mo
- $153
- White space
- 50k ft²
Inventory
90% occupiedPower
25 MWlive
2.5 MW to lease · 22.5 MW in use
White space
50k ft²total
5,000 ft² free · 45k ft² occupied
4,645 m² · 465 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 13.8 MW of the utility feed is cooling, conversion, and house load.
Power cost
$153/kW·mo
17.8¢ industrial · 21¢ after PUE 1.18
- Per MW·year
- $1.8M
- This site · 25 MW
- $46M/yr
- 70 kW rack
- $10,733/mo
5.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $38M/yr less.
TEPCO Chiba · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2026
- Renewable match
- 50%
- Rack density
- 70 kW
- PUE
- 1.181.00 ideal · 1.60 typical
- Power source
- TEPCO. Dual utility feeds. Seismically isolated (免震) building.
Cooling
Plant
Direct-to-chip
Liquid
Deployed
Rack density
70 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
AI factory hall. 70 kW/rack standard, up to 150 kW. NVIDIA DGX-Ready. Hybrid liquid/air. DRIL innovation lab on campus.
Network carriers
9On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
6Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Inzai, Chiba, Japan
NRT campus, Inzai, Chiba
35.838°, 140.154° · Asia
Tenants / users
AI clouds, hyperscale GPU
Notes
Third NRT building, opened April 2026. Pushes NRT campus to ~100 MW IT. APAC's first Digital Realty DRIL lab.