MC Digital Realty KIX15
MC Digital Realty · KIX Campus
- Planned IT
- 24 MW
- Free to lease
- —
- $ / kW·mo
- $154
- White space
- —
Inventory
100% occupiedPower
24 MWlive
0 MW to lease · 24 MW in use
White space
—total
— free
—
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$154/kW·mo
16.2¢ industrial · 21.1¢ after PUE —
- Per MW·year
- $1.8M
- This site · 24 MW
- $44M/yr
5.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $36M/yr less.
Kansai Electric · utility tariff × PUE, not colo list price.
- Redundancy
- —
- Opened
- —
- Renewable match
- —
- Rack density
- —
- Voltage
- —
- PUE
- —1.00 ideal · 1.60 typical
- Power source
- —
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
—
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Designed for hybrid air and liquid cooling (Digital Realty).
Network carriers
0No on-net carriers published.
On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
0No public-cloud on-ramp published.
Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Ibaraki, Osaka, Japan
34.816°, 135.569° · Asia
Notes
Construction started on KIX15, a 24 MW facility and the fifth at MCDR's KIX Campus in Ibaraki City; operations scheduled Q4 2028 (Digital Realty, Oct 7 2026). Coordinates: Ibaraki city center (approximate). Source: https://investor.digitalrealty.com/news-releases/news-release-details/digital-realty-commences-construction-kix15-data-center
Compiled from public filings, operator pages, and reporting. Not an official operator specification.