Under construction
Colocation
Liquid cooling

MC Digital Realty KIX15

MC Digital Realty · KIX Campus

Planned IT
24 MW
Free to lease
—
$ / kW·mo
$154
White space
—

Inventory

100% occupied

Power

24 MWlive

0 MW to lease · 24 MW in use

White space

—total

— free

—

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live—
Free to lease—
Utility feed—
Campus / planned24 MW

Power cost

$154/kW·mo

16.2¢ industrial · 21.1¢ after PUE —

Per MW·year
$1.8M
This site · 24 MW
$44M/yr
3.2¢ cheapdear 22.4¢

5.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $36M/yr less.

Kansai Electric · utility tariff × PUE, not colo list price.

Redundancy
—
Opened
—
Renewable match
—
Rack density
—
Voltage
—
PUE
—1.00 ideal · 1.60 typical
Power source
—

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

—

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Designed for hybrid air and liquid cooling (Digital Realty).

Network carriers

0

No on-net carriers published.

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

0

No public-cloud on-ramp published.

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Ibaraki, Osaka, Japan

34.816°, 135.569° · Asia

Notes

Construction started on KIX15, a 24 MW facility and the fifth at MCDR's KIX Campus in Ibaraki City; operations scheduled Q4 2028 (Digital Realty, Oct 7 2026). Coordinates: Ibaraki city center (approximate). Source: https://investor.digitalrealty.com/news-releases/news-release-details/digital-realty-commences-construction-kix15-data-center

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.