Operational
Colocation
Air cooled
Tier III

Maroc Telecom Casablanca

Maroc Telecom · Casablanca

IT live
6 MW
Free to lease
0.7 MW
$ / kW·mo
$100
White space
47k ft²

Inventory

88% occupied

Power

6 MWlive

0.7 MW to lease · 5.3 MW in use

White space

47k ft²total

5,625 ft² free · 41k ft² occupied

4,355 m² · 523 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live6 MW
Free to lease0.7 MW
Utility feed10 MW
Campus / planned8 MW

About 4 MW of the utility feed is cooling, conversion, and house load.

Power cost

$100/kW·mo

9.8¢ industrial · 13.7¢ after PUE 1.40

Per MW·year
$1.2M
This site · 6 MW
$7.2M/yr
6 kW rack
$601/mo
3.2¢ cheapdear 22.4¢

3.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $4.9M/yr less.

ONEE · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2006
Renewable match
20%
Rack density
6 kW
Voltage
PUE
1.401.00 ideal · 1.60 typical
Power source
ONEE Morocco plus on-site generation.

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

6 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Chilled-water CRAH, N+1. Liquid-ready suites offered on newer campus halls.

Network carriers

3

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

2

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Casablanca, Casablanca-Settat, Morocco

Casablanca, Morocco

33.590°, -7.620° · Africa

Tenants / users

IAM, enterprise, government

Notes

Incumbent telco colo. Complements N+ONE and inwi.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.