Expanding
Colocation
Liquid cooling
Tier III

Macquarie IC3 Super West

Macquarie Data Centres · Macquarie Park

IT live
25 MW
Free to lease
31 MW
$ / kW·mo
$126
White space
104k ft²

Inventory

0% occupied

Power

25 MWlive

31 MW to lease · 0 MW in use

White space

104k ft²total

129k ft² free · occupied

9,677 m² · 12k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live25 MW
Free to lease31 MW
Utility feed81.3 MW
Campus / planned65 MW

About 56.3 MW of the utility feed is cooling, conversion, and house load.

Power cost

$126/kW·mo

14.2¢ industrial · 17.3¢ after PUE 1.22

Per MW·year
$1.5M
This site · 25 MW
$38M/yr
20 kW rack
$2,529/mo
3.2¢ cheapdear 22.4¢

4.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $29M/yr less.

NSW NEM · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2020
Renewable match
70%
Rack density
20 kW
PUE
1.221.00 ideal · 1.60 typical
Power source
Ausgrid. IC3 Super West 47 MW coming 2026.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

AI-ready. Campus ~65 MW with IC2/IC3 East.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Macquarie Park, New South Wales, Australia

Macquarie Park, NSW

-33.777°, 151.125° · Oceania

Tenants / users

Enterprise, AI, government

Notes

Macquarie Park interconnection plus AI halls. Future 150 MW Sydney campus planned.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.