LG Uplus Pyeongtaek

LG Uplus · Pyeongtaek

IT live
30 MW
Free to lease
38 MW
$ / kW·mo
$94
White space
94k ft²

Inventory

0% occupied

Power

30 MWlive

38 MW to lease · 0 MW in use

White space

94k ft²total

119k ft² free · occupied

8,710 m² · 11k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live30 MW
Free to lease38 MW
Utility feed100 MW
Campus / planned80 MW

About 70 MW of the utility feed is cooling, conversion, and house load.

Power cost

$94/kW·mo

10.6¢ industrial · 12.9¢ after PUE 1.22

Per MW·year
$1.1M
This site · 30 MW
$34M/yr
30 kW rack
$2,832/mo
3.2¢ cheapdear 22.4¢

3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $24M/yr less.

KEPCO industrial · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2023
Renewable match
40%
Rack density
30 kW
PUE
1.221.00 ideal · 1.60 typical
Power source
KEPCO. Dual utility feeds.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

30 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Direct-to-chip cold plates and rear-door heat exchangers. Designed for GB200/Blackwell-class racks.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Pyeongtaek, Gyeonggi, South Korea

Pyeongtaek, Gyeonggi

37.000°, 127.090° · Asia

Tenants / users

Hyperscale, AI, cloud

Notes

LG Uplus hyperscale campus in the Pyeongtaek DC belt. Liquid-ready AI halls.