LG Uplus Pyeongtaek
LG Uplus · Pyeongtaek
- IT live
- 30 MW
- Free to lease
- 38 MW
- $ / kW·mo
- $94
- White space
- 94k ft²
Inventory
0% occupiedPower
30 MWlive
38 MW to lease · 0 MW in use
White space
94k ft²total
119k ft² free · — occupied
8,710 m² · 11k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 70 MW of the utility feed is cooling, conversion, and house load.
Power cost
$94/kW·mo
10.6¢ industrial · 12.9¢ after PUE 1.22
- Per MW·year
- $1.1M
- This site · 30 MW
- $34M/yr
- 30 kW rack
- $2,832/mo
3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $24M/yr less.
KEPCO industrial · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2023
- Renewable match
- 40%
- Rack density
- 30 kW
- PUE
- 1.221.00 ideal · 1.60 typical
- Power source
- KEPCO. Dual utility feeds.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
30 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Direct-to-chip cold plates and rear-door heat exchangers. Designed for GB200/Blackwell-class racks.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Pyeongtaek, Gyeonggi, South Korea
Pyeongtaek, Gyeonggi
37.000°, 127.090° · Asia
Tenants / users
Hyperscale, AI, cloud
Notes
LG Uplus hyperscale campus in the Pyeongtaek DC belt. Liquid-ready AI halls.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.