Lefdal Mine Datacenter
Lefdal Mine Datacenter · Lefdal

- IT live
- 37 MW
- Free to lease
- 5.2 MW
- $ / kW·mo
- $34
- White space
- 333k ft²
Inventory
86% occupiedPower
37 MWlive
5.2 MW to lease · 31.8 MW in use
White space
333k ft²total
22k ft² free · 312k ft² occupied
31k m² · 2,005 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 43 MW of the utility feed is cooling, conversion, and house load.
Power cost
$34/kW·mo
4¢ industrial · 4.6¢ after PUE 1.15
- Per MW·year
- $403k
- This site · 37 MW
- $15M/yr
- 20 kW rack
- $672/mo
1.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $3M/yr less.
Norway NO3 / Lefdal 132 kV · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2017
- Renewable match
- 100%
- Rack density
- 20 kW
- PUE
- 1.151.00 ideal · 1.60 typical
- Power source
- Statnett 132 kV. Dual mountain-hall transformers. Hydro and wind.
Cooling
Plant
Seawater
Liquid
Deployed
Rack density
20 kW
H100-eq
—
WUE
0.02 L/kWh
this site · 2025 · 6,482 m³/yr at 37 MW
Measured at this building. Lefdal Mine Datacenter (fjord closed-loop, no evaporative).
Fjord / seawater heat exchange. Closed loop, near-zero freshwater. Mountain-hall or coastal plant.
Network carriers
3On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
3Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Nordfjordeid, Vestland, Norway
Lefdal olivine mine, Nordfjord
61.912°, 5.992° · Europe
Tenants / users
HPC, colo, supercomputing
Notes
Europe's largest underground hall by floor area: 120,000 sqm in a former olivine mine, 60 m below sea level. 37 MW live, 43 MW building, 80 MW connected, 200 MW end-state. WUE near zero. 3i Infrastructure majority 2026.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.