Under construction
Colocation
Liquid cooling
Tier III

Layer 9 Queretaro

Layer 9 Data Centers · QRO

Planned IT
24 MW
Free to lease
24 MW
$ / kW·mo
$89
White space
100k ft²

Inventory

0% occupied

Power

24 MWlive

24 MW to lease · 0 MW in use

White space

100k ft²total

100k ft² free · occupied

9,290 m² · 9,290 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease24 MW
Utility feed
Campus / planned24 MW

Power cost

$89/kW·mo

9.8¢ industrial · 12.3¢ after PUE 1.25

Per MW·year
$1.1M
This site · 24 MW
$26M/yr
20 kW rack
$1,789/mo
3.2¢ cheapdear 22.4¢

3.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $17M/yr less.

CFE Queretaro · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2027
Renewable match
30%
Rack density
20 kW
Voltage
PUE
1.251.00 ideal · 1.60 typical
Power source
CFE. Dual 23 kV or 115 kV inlets plus on-site diesel. Mexican federal grid; interconnection queues are the constraint.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Queretaro, Queretaro, Mexico

Queretaro

20.572°, -100.368° · North America

Tenants / users

Hyperscale, cloud, enterprise

Notes

New-entrant Mexican wholesale. Arizton lists Layer 9 among 2025-26 Queretaro builders. Construction.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.