Under construction
Colocation
Air cooled
Tier III

KIO MEX8 Mexico City

KIO Data Centers · Mexico City

Planned IT
4 MW
Free to lease
4 MW
$ / kW·mo
$95
White space
25k ft²

Inventory

0% occupied

Power

4 MWlive

4 MW to lease · 0 MW in use

White space

25k ft²total

25k ft² free · occupied

2,323 m² · 2,323 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease4 MW
Utility feed
Campus / planned4 MW

Power cost

$95/kW·mo

10.4¢ industrial · 13¢ after PUE 1.25

Per MW·year
$1.1M
This site · 4 MW
$4.6M/yr
10 kW rack
$949/mo
3.2¢ cheapdear 22.4¢

3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $3.2M/yr less.

CFE CDMX · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2027
Renewable match
25%
Rack density
10 kW
Voltage
PUE
1.251.00 ideal · 1.60 typical
Power source
CFE. Dual 23 kV or 115 kV inlets plus on-site diesel. Mexican federal grid; interconnection queues are the constraint.

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

10 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Chilled-water CRAH, N+1. Isolated hot aisles. Not an AI factory unless noted.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Mexico City, Mexico City, Mexico

Mexico City

19.428°, -99.141° · North America

Tenants / users

Enterprise, government, networks

Notes

Fourth-generation CDMX KIO. 4 MW, 70 million USD. Ground broken March 2026, targeted Q1 2027. Complements Santa Fe interconnection.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.