KIO MEX8 Mexico City
KIO Data Centers · Mexico City
- Planned IT
- 4 MW
- Free to lease
- 4 MW
- $ / kW·mo
- $95
- White space
- 25k ft²
Inventory
0% occupiedPower
4 MWlive
4 MW to lease · 0 MW in use
White space
25k ft²total
25k ft² free · — occupied
2,323 m² · 2,323 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$95/kW·mo
10.4¢ industrial · 13¢ after PUE 1.25
- Per MW·year
- $1.1M
- This site · 4 MW
- $4.6M/yr
- 10 kW rack
- $949/mo
3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $3.2M/yr less.
CFE CDMX · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2027
- Renewable match
- 25%
- Rack density
- 10 kW
- PUE
- 1.251.00 ideal · 1.60 typical
- Power source
- CFE. Dual 23 kV or 115 kV inlets plus on-site diesel. Mexican federal grid; interconnection queues are the constraint.
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
10 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Chilled-water CRAH, N+1. Isolated hot aisles. Not an AI factory unless noted.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Mexico City, Mexico City, Mexico
Mexico City
19.428°, -99.141° · North America
Tenants / users
Enterprise, government, networks
Notes
Fourth-generation CDMX KIO. 4 MW, 70 million USD. Ground broken March 2026, targeted Q1 2027. Complements Santa Fe interconnection.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.