KIO MEX6 Lerma

KIO Data Centers · Lerma

IT live
14 MW
Free to lease
1.7 MW
$ / kW·mo
$95
White space
142k ft²

Inventory

88% occupied

Power

14 MWlive

1.7 MW to lease · 12.3 MW in use

White space

142k ft²total

9,545 ft² free · 133k ft² occupied

13k m² · 887 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live14 MW
Free to lease1.7 MW
Utility feed25 MW
Campus / planned20 MW

About 11 MW of the utility feed is cooling, conversion, and house load.

Power cost

$95/kW·mo

10.2¢ industrial · 13.1¢ after PUE 1.28

Per MW·year
$1.1M
This site · 14 MW
$16M/yr
12 kW rack
$1,144/mo
3.2¢ cheapdear 22.4¢

3.2× the cheapest market (Iceland Landsvirkjun). Same IT load there is $11M/yr less.

CFE industrial · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2019
Renewable match
25%
Rack density
12 kW
Voltage
PUE
1.281.00 ideal · 1.60 typical
Power source
CFE. Dual 23 kV or 115 kV inlets plus on-site diesel. Mexican federal grid; interconnection queues are the constraint.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

12 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Lerma, State of Mexico, Mexico

Lerma, State of Mexico

19.285°, -99.512° · North America

Tenants / users

Enterprise, cloud, wholesale

Notes

Lerma 2N hall west of CDMX. Completes the State of Mexico KIO pair with Tultitlan.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.