Expanding
Colocation
Liquid cooling
Tier III

KIO MEX5 Tultitlan

KIO Data Centers · Tultitlan

IT live
12 MW
Free to lease
1.4 MW
$ / kW·mo
$95
White space
128k ft²

Inventory

88% occupied

Power

12 MWlive

1.4 MW to lease · 10.6 MW in use

White space

128k ft²total

8,182 ft² free · 120k ft² occupied

12k m² · 760 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live12 MW
Free to lease1.4 MW
Utility feed22.5 MW
Campus / planned18 MW

About 10.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$95/kW·mo

10.2¢ industrial · 13.1¢ after PUE 1.28

Per MW·year
$1.1M
This site · 12 MW
$14M/yr
12 kW rack
$1,144/mo
3.2¢ cheapdear 22.4¢

3.2× the cheapest market (Iceland Landsvirkjun). Same IT load there is $9.4M/yr less.

CFE industrial · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2016
Renewable match
25%
Rack density
12 kW
Voltage
PUE
1.281.00 ideal · 1.60 typical
Power source
CFE. Dual 23 kV or 115 kV inlets plus on-site diesel. Mexican federal grid; interconnection queues are the constraint.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

12 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Tultitlan, State of Mexico, Mexico

Tultitlan, State of Mexico

19.645°, -99.168° · North America

Tenants / users

Enterprise, cloud, wholesale

Notes

Large-scale KIO north of CDMX. Tier III, carrier-neutral. Scale hall vs Santa Fe interconnection.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.