Expanding
Colocation
Air cooled
Tier III

KIO MEX3 Santa Fe III

KIO Data Centers · Santa Fe

IT live
6 MW
Free to lease
0.7 MW
$ / kW·mo
$95
White space
69k ft²

Inventory

88% occupied

Power

6 MWlive

0.7 MW to lease · 5.3 MW in use

White space

69k ft²total

5,000 ft² free · 64k ft² occupied

6,452 m² · 465 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live6 MW
Free to lease0.7 MW
Utility feed10 MW
Campus / planned8 MW

About 4 MW of the utility feed is cooling, conversion, and house load.

Power cost

$95/kW·mo

10.4¢ industrial · 13¢ after PUE 1.25

Per MW·year
$1.1M
This site · 6 MW
$6.8M/yr
8 kW rack
$759/mo
3.2¢ cheapdear 22.4¢

3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $4.7M/yr less.

CFE CDMX · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2014
Renewable match
25%
Rack density
8 kW
Voltage
PUE
1.251.00 ideal · 1.60 typical
Power source
CFE. Dual 23 kV or 115 kV inlets plus on-site diesel. Mexican federal grid; interconnection queues are the constraint.

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

8 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Chilled-water CRAH, N+1. Isolated hot aisles. Not an AI factory unless noted.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Mexico City, Mexico City, Mexico

Santa Fe, Mexico City

19.361°, -99.265° · North America

Tenants / users

Enterprise, cloud, networks

Notes

Third Santa Fe KIO hall. Pair to MEX2 Tier IV. Mexico City carrier-neutral cluster.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.