Expanding
Colocation
Air cooled
Tier III

KIO MEX1 Mexico City

KIO Data Centers · Mexico City

IT live
4 MW
Free to lease
0.5 MW
$ / kW·mo
$97
White space
52k ft²

Inventory

88% occupied

Power

4 MWlive

0.5 MW to lease · 3.5 MW in use

White space

52k ft²total

3,333 ft² free · 49k ft² occupied

4,839 m² · 310 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live4 MW
Free to lease0.5 MW
Utility feed7.5 MW
Campus / planned6 MW

About 3.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$97/kW·mo

10.4¢ industrial · 13.3¢ after PUE 1.28

Per MW·year
$1.2M
This site · 4 MW
$4.7M/yr
8 kW rack
$777/mo
3.2¢ cheapdear 22.4¢

3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $3.2M/yr less.

CFE CDMX · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2002
Renewable match
25%
Rack density
8 kW
Voltage
PUE
1.281.00 ideal · 1.60 typical
Power source
CFE. Dual 23 kV or 115 kV inlets plus on-site diesel. Mexican federal grid; interconnection queues are the constraint.

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

8 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Chilled-water CRAH, N+1. Isolated hot aisles. Not an AI factory unless noted.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Mexico City, Mexico City, Mexico

Mexico City

19.433°, -99.133° · North America

Tenants / users

Enterprise, government, networks

Notes

Original KIO Mexico City hall. I Squared Capital. Complements Equinix MX which sits in Queretaro.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.