Operational
Colocation
Air cooled
Tier III

KIO HER1 Hermosillo

KIO Data Centers · Hermosillo

IT live
3 MW
Free to lease
0.4 MW
$ / kW·mo
$95
White space
39k ft²

Inventory

88% occupied

Power

3 MWlive

0.4 MW to lease · 2.6 MW in use

White space

39k ft²total

2,812 ft² free · 36k ft² occupied

3,629 m² · 261 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live3 MW
Free to lease0.4 MW
Utility feed5 MW
Campus / planned4 MW

About 2 MW of the utility feed is cooling, conversion, and house load.

Power cost

$95/kW·mo

10.2¢ industrial · 13.1¢ after PUE 1.28

Per MW·year
$1.1M
This site · 3 MW
$3.4M/yr
6 kW rack
$572/mo
3.2¢ cheapdear 22.4¢

3.2× the cheapest market (Iceland Landsvirkjun). Same IT load there is $2.4M/yr less.

CFE industrial · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2014
Renewable match
30%
Rack density
6 kW
Voltage
PUE
1.281.00 ideal · 1.60 typical
Power source
CFE. Dual 23 kV or 115 kV inlets plus on-site diesel. Mexican federal grid; interconnection queues are the constraint.

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

6 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Chilled-water CRAH, N+1. Isolated hot aisles. Not an AI factory unless noted.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Hermosillo, Sonora, Mexico

Hermosillo, Sonora

29.073°, -110.956° · North America

Tenants / users

Enterprise, government, regional networks

Notes

Sonora KIO. Nearshore northwest. Not a hyperscale campus.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.