KIO HER1 Hermosillo
KIO Data Centers · Hermosillo
- IT live
- 3 MW
- Free to lease
- 0.4 MW
- $ / kW·mo
- $95
- White space
- 39k ft²
Inventory
88% occupiedPower
3 MWlive
0.4 MW to lease · 2.6 MW in use
White space
39k ft²total
2,812 ft² free · 36k ft² occupied
3,629 m² · 261 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 2 MW of the utility feed is cooling, conversion, and house load.
Power cost
$95/kW·mo
10.2¢ industrial · 13.1¢ after PUE 1.28
- Per MW·year
- $1.1M
- This site · 3 MW
- $3.4M/yr
- 6 kW rack
- $572/mo
3.2× the cheapest market (Iceland Landsvirkjun). Same IT load there is $2.4M/yr less.
CFE industrial · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2014
- Renewable match
- 30%
- Rack density
- 6 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- CFE. Dual 23 kV or 115 kV inlets plus on-site diesel. Mexican federal grid; interconnection queues are the constraint.
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
6 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Chilled-water CRAH, N+1. Isolated hot aisles. Not an AI factory unless noted.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Hermosillo, Sonora, Mexico
Hermosillo, Sonora
29.073°, -110.956° · North America
Tenants / users
Enterprise, government, regional networks
Notes
Sonora KIO. Nearshore northwest. Not a hyperscale campus.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.