Under construction
Colocation
Liquid cooling
Tier III

Khazna / Benya Cairo

Khazna Data Centers · Cairo

Planned IT
40 MW
Free to lease
32 MW
$ / kW·mo
$64
White space
125k ft²

Inventory

20% occupied

Power

40 MWlive

32 MW to lease · 8 MW in use

White space

125k ft²total

100k ft² free · 25k ft² occupied

12k m² · 9,290 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live—
Free to lease32 MW
Utility feed—
Campus / planned40 MW

Power cost

$64/kW·mo

7¢ industrial · 8.8¢ after PUE 1.25

Per MW·year
$767k
This site · 40 MW
$31M/yr
30 kW rack
$1,916/mo
3.2¢ cheapdear 22.4¢

2.2× the cheapest market (Iceland Landsvirkjun). Same IT load there is $17M/yr less.

Egypt EEHC · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2028
Renewable match
20%
Rack density
30 kW
Voltage
PUE
1.251.00 ideal · 1.60 typical
Power source
Egyptian Electricity Holding Company. Dual feeds plus on-site generation.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

30 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Direct-to-chip cold plates and rear-door heat exchangers. Designed for GB200/Blackwell-class racks.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

3

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Cairo, Cairo, Egypt

Greater Cairo

30.080°, 31.400° · Africa

Tenants / users

Hyperscale, cloud, government

Notes

UAE Khazna + Benya Group Egypt campus. Gulf-capital hyperscale push into Cairo.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.