Key Point Primorye
Key Point · TOR Primorye
- IT live
- 8 MW
- Free to lease
- 1.1 MW
- $ / kW·mo
- $42
- White space
- 125k ft²
Inventory
86% occupiedPower
8 MWlive
1.1 MW to lease · 6.9 MW in use
White space
125k ft²total
7,000 ft² free · 118k ft² occupied
12k m² · 650 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 12 MW of the utility feed is cooling, conversion, and house load.
Power cost
$42/kW·mo
4.4¢ industrial · 5.7¢ after PUE 1.30
- Per MW·year
- $501k
- This site · 8 MW
- $4M/yr
- 10 kW rack
- $418/mo
1.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $1.1M/yr less.
Rosseti Far East · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2023
- Renewable match
- 30%
- Rack density
- 10 kW
- PUE
- 1.301.00 ideal · 1.60 typical
- Power source
- Rosseti Far East / Primorye grid. Dual feeds. Hydro and thermal mix.
Cooling
Plant
Free air
Liquid
Not deployed
Rack density
10 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Cold-climate free-air economization most of the year. Closed-loop dry coolers; no evaporative towers.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Vladivostok, Primorsky Krai, Russia
TOR Primorye, Primorsky Krai
43.120°, 131.887° · Asia
Tenants / users
Far East enterprise, China-facing, government
Notes
Far East commercial campus in the Primorye ASEZ. Russia-Asia cable adjacency at Vladivostok. Dual-continent listing: Asia, not Moscow-Europe.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.