Keppel Tokyo 2
Keppel Data Centres · Tokyo
- Planned IT
- 36 MW
- Free to lease
- 28.8 MW
- $ / kW·mo
- $164
- White space
- 129k ft²
Inventory
20% occupiedPower
36 MWlive
28.8 MW to lease · 7.2 MW in use
White space
129k ft²total
103k ft² free · 26k ft² occupied
12k m² · 9,556 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$164/kW·mo
18.4¢ industrial · 22.4¢ after PUE 1.22
- Per MW·year
- $2M
- This site · 36 MW
- $71M/yr
- 25 kW rack
- $4,097/mo
5.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $58M/yr less.
TEPCO extra-high voltage · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2026
- Renewable match
- 40%
- Rack density
- 25 kW
- PUE
- 1.221.00 ideal · 1.60 typical
- Power source
- TEPCO. Dual utility feeds. Seismically isolated (免震) building.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
25 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
8On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Tokyo, Tokyo, Japan
Greater Tokyo
35.700°, 139.720° · Asia
Tenants / users
Hyperscale, enterprise
Notes
36 MW Keppel Tokyo 2, targeting Q4 2026. ~361,000 sq ft.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.