Planned
Colocation
Liquid cooling
Tier III

Keppel DC SGP 11 Jurong Island

Keppel Data Centres · Jurong Island

Planned IT
50 MW
Free to lease
50 MW
$ / kW·mo
$180
White space
125k ft²

Inventory

0% occupied

Power

50 MWlive

50 MW to lease · 0 MW in use

White space

125k ft²total

125k ft² free · occupied

12k m² · 12k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease50 MW
Utility feed
Campus / planned50 MW

Power cost

$180/kW·mo

21.2¢ industrial · 24.6¢ after PUE 1.16

Per MW·year
$2.2M
This site · 50 MW
$108M/yr
40 kW rack
$7,181/mo
3.2¢ cheapdear 22.4¢

6.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $91M/yr less.

Singapore EMA · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2029
Renewable match
55%
Rack density
40 kW
Voltage
PUE
1.161.00 ideal · 1.60 typical
Power source
SP Group. Dual feeds plus on-site generators. Capacity still gated by IMDA/EDB CFA awards.

Cooling

Plant

Direct-to-chip

Liquid

Deployed

Rack density

40 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Direct-to-chip cold plates and rear-door heat exchangers. Designed for GB200/Blackwell-class racks.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Singapore, Singapore, Singapore

Southern Jurong Island, Singapore

1.268°, 103.706° · Asia

Tenants / users

AI, hyperscale — CFA2 award

Notes

50 MW CFA2 award Aug 2026. More than SGD 1 billion. Next to Keppel Merlimau Cogen; designed to offtake imported Riau solar once the subsea link lands.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.