Operational
Crypto / HPC
Air cooled
Tier III

Keel Sherbrooke Garlock

Keel Infrastructure · Sherbrooke

IT live
18 MW
Remaining
0 MW
$ / kW·mo
$36
White space
100k ft²

Inventory

100% occupied

Power

18 MWcampus

0 MW to commission · 18 MW in use

White space

100k ft²total

— free · 100k ft² occupied

9,332 m²

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live18 MW
Remaining0 MW
Utility feed22.5 MW
Campus / planned18 MW

About 4.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$36/kW·mo

4.7¢ industrial · 4.9¢ after PUE 1.05

Per MW·year
$432k
This site · 18 MW
$7.8M/yr
18 kW rack
$648/mo
3.2¢ cheapdear 22.4¢

1.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $2.5M/yr less.

Hydro-Sherbrooke · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2021
Renewable match
99%
Rack density
18 kW
PUE
1.051.00 ideal · 1.60 typical
Power source
Hydro-Sherbrooke / Hydro-Québec. Dual feeds. Eastern Townships hydro.

Cooling

Plant

Free air

Liquid

Not deployed

Rack density

18 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Cool-climate free-air economization most of the year. Closed-loop dry coolers; no evaporative towers.

Network carriers

7

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Sherbrooke, Quebec, Canada

4228 Rue de la Garlock, Sherbrooke, QC

45.402°, -71.892° · North America

Tenants / users

Bitcoin self-mining

Notes

18 MW Garlock. Completes the 96 MW Sherbrooke campus — the densest crypto cluster in Québec.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.