Keel Sherbrooke Garlock
Keel Infrastructure · Sherbrooke
- IT live
- 18 MW
- Remaining
- 0 MW
- $ / kW·mo
- $36
- White space
- 100k ft²
Inventory
100% occupiedPower
18 MWcampus
0 MW to commission · 18 MW in use
White space
100k ft²total
— free · 100k ft² occupied
9,332 m²
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 4.5 MW of the utility feed is cooling, conversion, and house load.
Power cost
$36/kW·mo
4.7¢ industrial · 4.9¢ after PUE 1.05
- Per MW·year
- $432k
- This site · 18 MW
- $7.8M/yr
- 18 kW rack
- $648/mo
1.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $2.5M/yr less.
Hydro-Sherbrooke · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2021
- Renewable match
- 99%
- Rack density
- 18 kW
- PUE
- 1.051.00 ideal · 1.60 typical
- Power source
- Hydro-Sherbrooke / Hydro-Québec. Dual feeds. Eastern Townships hydro.
Cooling
Plant
Free air
Liquid
Not deployed
Rack density
18 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Cool-climate free-air economization most of the year. Closed-loop dry coolers; no evaporative towers.
Network carriers
7On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Sherbrooke, Quebec, Canada
4228 Rue de la Garlock, Sherbrooke, QC
45.402°, -71.892° · North America
Tenants / users
Bitcoin self-mining
Notes
18 MW Garlock. Completes the 96 MW Sherbrooke campus — the densest crypto cluster in Québec.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.