Operational
Crypto / HPC
Air cooled
Tier III

Keel Farnham

Keel Infrastructure · Eastern Townships

IT live
10 MW
Remaining
0 MW
$ / kW·mo
$37
White space
63k ft²

Inventory

100% occupied

Power

10 MWcampus

0 MW to commission · 10 MW in use

White space

63k ft²total

— free · 63k ft² occupied

5,806 m²

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live10 MW
Remaining0 MW
Utility feed12.5 MW
Campus / planned10 MW

About 2.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$37/kW·mo

4.8¢ industrial · 5.1¢ after PUE 1.06

Per MW·year
$446k
This site · 10 MW
$4.5M/yr
15 kW rack
$557/mo
3.2¢ cheapdear 22.4¢

1.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $1.5M/yr less.

Hydro-Québec Rate L / Townships · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2018
Renewable match
99%
Rack density
15 kW
PUE
1.061.00 ideal · 1.60 typical
Power source
Hydro-Québec. Dual MV inlets plus on-site diesel. ~99.8 percent hydro (Rate L on large sites).

Cooling

Plant

Free air

Liquid

Not deployed

Rack density

15 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Cool-climate free-air economization most of the year. Closed-loop dry coolers; no evaporative towers.

Network carriers

7

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Farnham, Quebec, Canada

1050 Boulevard Magenta Est, Farnham, QC J2N 1B8

45.287°, -72.975° · North America

Tenants / users

Bitcoin self-mining

Notes

10 MW. Completes the 170 MW Keel Québec footprint (Sherbrooke 96 + Baie-Comeau 22 + other 52).

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.