Keel Cowansville
Keel Infrastructure · Eastern Townships
- IT live
- 17 MW
- Remaining
- 0 MW
- $ / kW·mo
- $37
- White space
- 102k ft²
Inventory
100% occupiedPower
17 MWcampus
0 MW to commission · 17 MW in use
White space
102k ft²total
— free · 102k ft² occupied
9,514 m²
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 4.3 MW of the utility feed is cooling, conversion, and house load.
Power cost
$37/kW·mo
4.8¢ industrial · 5.1¢ after PUE 1.06
- Per MW·year
- $446k
- This site · 17 MW
- $7.6M/yr
- 16 kW rack
- $594/mo
1.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $2.5M/yr less.
Hydro-Québec Rate L / Townships · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2018
- Renewable match
- 99%
- Rack density
- 16 kW
- PUE
- 1.061.00 ideal · 1.60 typical
- Power source
- Hydro-Québec. Dual MV inlets plus on-site diesel. ~99.8 percent hydro (Rate L on large sites).
Cooling
Plant
Free air
Liquid
Not deployed
Rack density
16 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Cool-climate free-air economization most of the year. Closed-loop dry coolers; no evaporative towers.
Network carriers
7On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Cowansville, Quebec, Canada
135 Rue Dean, Cowansville, QC J2K 3Y2
45.200°, -72.741° · North America
Tenants / users
Bitcoin self-mining
Notes
17 MW original-era Bitfarms hall. Hydro-Québec. Dual-site with Farnham, Magog, Saint-Hyacinthe (52 MW 'other sites').
Compiled from public filings, operator pages, and reporting. Not an official operator specification.