Keel Baie-Comeau
Keel Infrastructure · Baie-Comeau

- IT live
- 22 MW
- Remaining
- 0 MW
- $ / kW·mo
- $33
- White space
- 123k ft²
Inventory
100% occupiedPower
22 MWcampus
0 MW to commission · 22 MW in use
White space
123k ft²total
— free · 123k ft² occupied
11k m²
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 5.5 MW of the utility feed is cooling, conversion, and house load.
Power cost
$33/kW·mo
4.4¢ industrial · 4.6¢ after PUE 1.04
- Per MW·year
- $401k
- This site · 22 MW
- $8.8M/yr
- 18 kW rack
- $601/mo
1.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $2.4M/yr less.
Hydro-Québec Côte-Nord · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2022
- Renewable match
- 99%
- Rack density
- 18 kW
- PUE
- 1.041.00 ideal · 1.60 typical
- Power source
- Hydro-Québec Côte-Nord. Dual feeds. Baie-Comeau industrial hydro.
Cooling
Plant
Free air
Liquid
Not deployed
Rack density
18 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Cool-climate free-air economization most of the year. Closed-loop dry coolers; no evaporative towers.
Network carriers
7On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Baie-Comeau, Quebec, Canada
25 Avenue Babin, Baie-Comeau, QC G4Z 3A5
49.216°, -68.193° · North America
Tenants / users
Bitcoin self-mining
Notes
22 MW Côte-Nord hydro (second 11 MW hall energized Jan 2025). City of Baie-Comeau industrial rate. Complements the Eastern Townships book 800 km upriver.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.