Operational
Colocation
Liquid cooling
Tier III

KDDI Sakai AI Data Center

KDDI · Sakai

IT live
120 MW
Free to lease
9.6 MW
$ / kW·mo
$148
White space
240k ft²

Inventory

92% occupied

Power

120 MWlive

9.6 MW to lease · 110 MW in use

White space

240k ft²total

19k ft² free · 221k ft² occupied

22k m² · 1,784 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live120 MW
Free to lease9.6 MW
Utility feed150 MW
Campus / planned120 MW

About 30 MW of the utility feed is cooling, conversion, and house load.

Power cost

$148/kW·mo

17.2¢ industrial · 20.3¢ after PUE 1.18

Per MW·year
$1.8M
This site · 120 MW
$213M/yr
80 kW rack
$11,853/mo
3.2¢ cheapdear 22.4¢

5.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $174M/yr less.

Japan industrial · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2026
Renewable match
50%
Rack density
80 kW
PUE
1.181.00 ideal · 1.60 typical
Power source
Kansai Electric (KEPCO). Dual feeds. Seismically isolated building.

Cooling

Plant

Direct-to-chip

Liquid

Deployed

Rack density

80 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

AI-ready with GB200 direct-to-chip. ~57,000 m². Liquid-to-chip plus CRAH for standard cages.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

6

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Sakai, Osaka, Japan

Sakai City, Osaka

34.573°, 135.483° · Asia

Tenants / users

KDDI cloud, AI, hyperscale

Notes

120 MW Sakai AI campus, live February 2026. Among the largest single operating AI halls in Kansai.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.