Kasi Cloud Johannesburg
Kasi Cloud · Johannesburg
- IT live
- 6 MW
- Free to lease
- 1.1 MW
- $ / kW·mo
- $86
- White space
- 15k ft²
Inventory
82% occupiedPower
6 MWlive
1.1 MW to lease · 4.9 MW in use
White space
15k ft²total
2,700 ft² free · 12k ft² occupied
1,394 m² · 251 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 19 MW of the utility feed is cooling, conversion, and house load.
Power cost
$86/kW·mo
9.4¢ industrial · 11.8¢ after PUE 1.25
- Per MW·year
- $1M
- This site · 6 MW
- $6.2M/yr
- 40 kW rack
- $3,431/mo
2.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $4.1M/yr less.
Eskom Gauteng · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2023
- Renewable match
- 40%
- Rack density
- 40 kW
- PUE
- 1.251.00 ideal · 1.60 typical
- Power source
- Eskom plus on-site diesel and solar. Extended runtime sized for load-shedding ride-through.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
40 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Direct-to-chip cold plates and rear-door heat exchangers. Designed for GB200/Blackwell-class racks.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Johannesburg, Gauteng, South Africa
Johannesburg
-26.160°, 28.080° · Africa
Tenants / users
AI, cloud, enterprise GPU
Notes
South African AI colo. High-density GPU halls aimed at sovereign AI.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.