Operational
Colocation
Liquid cooling
Tier III

Kasi Cloud Johannesburg

Kasi Cloud · Johannesburg

IT live
6 MW
Free to lease
1.1 MW
$ / kW·mo
$86
White space
15k ft²

Inventory

82% occupied

Power

6 MWlive

1.1 MW to lease · 4.9 MW in use

White space

15k ft²total

2,700 ft² free · 12k ft² occupied

1,394 m² · 251 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live6 MW
Free to lease1.1 MW
Utility feed25 MW
Campus / planned20 MW

About 19 MW of the utility feed is cooling, conversion, and house load.

Power cost

$86/kW·mo

9.4¢ industrial · 11.8¢ after PUE 1.25

Per MW·year
$1M
This site · 6 MW
$6.2M/yr
40 kW rack
$3,431/mo
3.2¢ cheapdear 22.4¢

2.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $4.1M/yr less.

Eskom Gauteng · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2023
Renewable match
40%
Rack density
40 kW
PUE
1.251.00 ideal · 1.60 typical
Power source
Eskom plus on-site diesel and solar. Extended runtime sized for load-shedding ride-through.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

40 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Direct-to-chip cold plates and rear-door heat exchangers. Designed for GB200/Blackwell-class racks.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Johannesburg, Gauteng, South Africa

Johannesburg

-26.160°, 28.080° · Africa

Tenants / users

AI, cloud, enterprise GPU

Notes

South African AI colo. High-density GPU halls aimed at sovereign AI.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.