Operational
Colocation
Liquid cooling
Tier III

Kao Data KLON-03 Harlow

Kao Data · Harlow

IT live
17.6 MW
Free to lease
1.8 MW
$ / kW·mo
$153
White space
35k ft²

Inventory

90% occupied

Power

17.6 MWlive

1.8 MW to lease · 15.8 MW in use

White space

35k ft²total

3,520 ft² free · 32k ft² occupied

3,270 m² · 327 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live17.6 MW
Free to lease1.8 MW
Utility feed22 MW
Campus / planned17.6 MW

About 4.4 MW of the utility feed is cooling, conversion, and house load.

Power cost

$153/kW·mo

18.2¢ industrial · 20.9¢ after PUE 1.15

Per MW·year
$1.8M
This site · 17.6 MW
$32M/yr
80 kW rack
$12,223/mo
3.2¢ cheapdear 22.4¢

5.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $27M/yr less.

UKPN East · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2025
Renewable match
80%
Rack density
80 kW
Voltage
PUE
1.151.00 ideal · 1.60 typical
Power source
UK Power Networks plus operator renewable PPAs. Dual utility feeds.

Cooling

Plant

Direct-to-chip

Liquid

Deployed

Rack density

80 kW

H100-eq

12k

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Direct-to-chip cold plates and rear-door heat exchangers. Designed for GB200/Blackwell-class racks.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Harlow, England, United Kingdom

London Road, Harlow, Essex

51.778°, 0.096° · Europe

Tenants / users

Nebius, AI clouds, HPC

Notes

17.6 MW GPU hall. June 2026 ten-year Nebius deal for multi-MW AI cloud on renewable power.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.