Operational
Colocation
Liquid cooling
Tier III

Kao Data KLON-02 Harlow

Kao Data · Harlow

IT live
8.8 MW
Free to lease
0.9 MW
$ / kW·mo
$157
White space
28k ft²

Inventory

90% occupied

Power

8.8 MWlive

0.9 MW to lease · 7.9 MW in use

White space

28k ft²total

2,750 ft² free · 25k ft² occupied

2,555 m² · 255 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live8.8 MW
Free to lease0.9 MW
Utility feed11 MW
Campus / planned8.8 MW

About 2.2 MW of the utility feed is cooling, conversion, and house load.

Power cost

$157/kW·mo

18.2¢ industrial · 21.5¢ after PUE 1.18

Per MW·year
$1.9M
This site · 8.8 MW
$17M/yr
30 kW rack
$4,703/mo
3.2¢ cheapdear 22.4¢

5.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $14M/yr less.

UKPN East · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2021
Renewable match
80%
Rack density
30 kW
Voltage
PUE
1.181.00 ideal · 1.60 typical
Power source
UK Power Networks plus operator renewable PPAs. Dual utility feeds.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

30 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Harlow, England, United Kingdom

London Road, Harlow, Essex

51.777°, 0.094° · Europe

Tenants / users

HPC, AI, cloud

Notes

Second Harlow building. Campus targeting ~83 MW end-state.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.