Kao Data KLON-01 Harlow
Kao Data · Harlow
- IT live
- 8.8 MW
- Free to lease
- 0.9 MW
- $ / kW·mo
- $159
- White space
- 37k ft²
Inventory
90% occupiedPower
8.8 MWlive
0.9 MW to lease · 7.9 MW in use
White space
37k ft²total
3,667 ft² free · 33k ft² occupied
3,406 m² · 341 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 2.2 MW of the utility feed is cooling, conversion, and house load.
Power cost
$159/kW·mo
18.2¢ industrial · 21.8¢ after PUE 1.20
- Per MW·year
- $1.9M
- This site · 8.8 MW
- $17M/yr
- 20 kW rack
- $3,189/mo
5.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $14M/yr less.
UKPN East · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2018
- Renewable match
- 80%
- Rack density
- 20 kW
- PUE
- 1.201.00 ideal · 1.60 typical
- Power source
- UK Power Networks plus operator renewable PPAs. Dual utility feeds.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
20 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Harlow, England, United Kingdom
London Road, Harlow, Essex
51.776°, 0.092° · Europe
Tenants / users
HPC, enterprise, cloud
Notes
First Harlow hall on the 15-acre campus. Designed around high-density compute from day one.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.