Kakao Ansan
Kakao · Ansan
- IT live
- 20 MW
- Remaining
- 12 MW
- $ / kW·mo
- $94
- White space
- 83k ft²
Inventory
63% occupiedPower
32 MWcampus
12 MW to commission · 20 MW in use
White space
133k ft²total
50k ft² free · 83k ft² occupied
12k m² · 4,645 m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 20 MW of the utility feed is cooling, conversion, and house load.
Power cost
$94/kW·mo
10.6¢ industrial · 12.9¢ after PUE 1.22
- Per MW·year
- $1.1M
- This site · 20 MW
- $23M/yr
- 20 kW rack
- $1,888/mo
3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $16M/yr less.
KEPCO industrial · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2020
- Renewable match
- 40%
- Rack density
- 20 kW
- PUE
- 1.221.00 ideal · 1.60 typical
- Power source
- KEPCO. Dual utility feeds.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
20 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Ansan, Gyeonggi, South Korea
Ansan, Gyeonggi
37.320°, 126.830° · Asia
Tenants / users
Kakao, Kakao Cloud
Notes
Kakao's Gyeonggi campus. Complements NAVER Gak.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.