Operational
Hyperscale
Liquid cooling
Tier III

Kakao Ansan

Kakao · Ansan

IT live
20 MW
Remaining
12 MW
$ / kW·mo
$94
White space
83k ft²

Inventory

63% occupied

Power

32 MWcampus

12 MW to commission · 20 MW in use

White space

133k ft²total

50k ft² free · 83k ft² occupied

12k m² · 4,645 m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live20 MW
Remaining12 MW
Utility feed40 MW
Campus / planned32 MW

About 20 MW of the utility feed is cooling, conversion, and house load.

Power cost

$94/kW·mo

10.6¢ industrial · 12.9¢ after PUE 1.22

Per MW·year
$1.1M
This site · 20 MW
$23M/yr
20 kW rack
$1,888/mo
3.2¢ cheapdear 22.4¢

3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $16M/yr less.

KEPCO industrial · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2020
Renewable match
40%
Rack density
20 kW
PUE
1.221.00 ideal · 1.60 typical
Power source
KEPCO. Dual utility feeds.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Ansan, Gyeonggi, South Korea

Ansan, Gyeonggi

37.320°, 126.830° · Asia

Tenants / users

Kakao, Kakao Cloud

Notes

Kakao's Gyeonggi campus. Complements NAVER Gak.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.