Kagoshima Izumi Data Center
Getworks · Izumi
- IT live
- 6 MW
- Free to lease
- 0.5 MW
- $ / kW·mo
- $161
- White space
- 38k ft²
Inventory
92% occupiedPower
6 MWlive
0.5 MW to lease · 5.5 MW in use
White space
38k ft²total
3,000 ft² free · 35k ft² occupied
3,484 m² · 279 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 1.5 MW of the utility feed is cooling, conversion, and house load.
Power cost
$161/kW·mo
17.2¢ industrial · 22¢ after PUE 1.28
- Per MW·year
- $1.9M
- This site · 6 MW
- $12M/yr
- 10 kW rack
- $1,607/mo
5.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $9.4M/yr less.
Japan industrial · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2025
- Renewable match
- 40%
- Rack density
- 10 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- Kyushu Electric. Dual feeds.
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
10 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Chilled-water CRAH, N+1. Liquid-ready suites offered on newer halls.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
6Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Izumi, Kagoshima, Japan
Izumi, Kagoshima
32.090°, 130.353° · Asia
Tenants / users
Enterprise, OCX, regional cloud
Notes
Southern-Kyushu colo. OCX interconnect live 2026.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.