IXcellerate MOS4
IXcellerate · Moscow North
- IT live
- 7 MW
- Free to lease
- 1.0 MW
- $ / kW·mo
- $53
- White space
- 50k ft²
Inventory
86% occupiedPower
7 MWlive
1.0 MW to lease · 6.0 MW in use
White space
50k ft²total
5,568 ft² free · 44k ft² occupied
4,645 m² · 517 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 1.8 MW of the utility feed is cooling, conversion, and house load.
Power cost
$53/kW·mo
5.6¢ industrial · 7.3¢ after PUE 1.30
- Per MW·year
- $638k
- This site · 7 MW
- $4.5M/yr
- 12 kW rack
- $638/mo
1.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $1.9M/yr less.
Mosenergosbyt · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2024
- Renewable match
- 18%
- Rack density
- 12 kW
- PUE
- 1.301.00 ideal · 1.60 typical
- Power source
- MOESK / Mosenergosbyt. Dual 10 kV inlets plus on-site diesel. Gas-heavy Moscow grid; nuclear from Rosenergoatom on the ring.
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
12 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Chilled-water CRAH, N+1. Isolated hot aisles. Not an AI factory unless noted.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Moscow, Moscow, Russia
Altufyevo, northern Moscow
55.905°, 37.584° · Europe
Tenants / users
Enterprise, cloud
Notes
512-rack infill on North campus. 7 MW design.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.