Operational
Colocation
Liquid cooling
Tier III

IXcellerate MOS3

IXcellerate · Moscow North

IT live
30 MW
Free to lease
4.2 MW
$ / kW·mo
$53
White space
156k ft²

Inventory

86% occupied

Power

30 MWlive

4.2 MW to lease · 25.8 MW in use

White space

156k ft²total

18k ft² free · 139k ft² occupied

15k m² · 1,626 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live30 MW
Free to lease4.2 MW
Utility feed37.5 MW
Campus / planned30 MW

About 7.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$53/kW·mo

5.6¢ industrial · 7.3¢ after PUE 1.30

Per MW·year
$638k
This site · 30 MW
$19M/yr
20 kW rack
$1,063/mo
3.2¢ cheapdear 22.4¢

1.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $8.2M/yr less.

Mosenergosbyt · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2025
Renewable match
18%
Rack density
20 kW
Voltage
PUE
1.301.00 ideal · 1.60 typical
Power source
MOESK / Mosenergosbyt. Dual 10 kV inlets plus on-site diesel. Gas-heavy Moscow grid; nuclear from Rosenergoatom on the ring.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus high-density cages to 55 kW. Cold-wall / contained-aisle. Liquid-ready on request.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Moscow, Moscow, Russia

Altufyevo, northern Moscow

55.907°, 37.589° · Europe

Tenants / users

Cloud, wholesale, AI colo

Notes

Greenfield North hall, 30 MW. Last of the original North campus build-out.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.