IXcellerate MOS3
IXcellerate · Moscow North
- IT live
- 30 MW
- Free to lease
- 4.2 MW
- $ / kW·mo
- $53
- White space
- 156k ft²
Inventory
86% occupiedPower
30 MWlive
4.2 MW to lease · 25.8 MW in use
White space
156k ft²total
18k ft² free · 139k ft² occupied
15k m² · 1,626 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 7.5 MW of the utility feed is cooling, conversion, and house load.
Power cost
$53/kW·mo
5.6¢ industrial · 7.3¢ after PUE 1.30
- Per MW·year
- $638k
- This site · 30 MW
- $19M/yr
- 20 kW rack
- $1,063/mo
1.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $8.2M/yr less.
Mosenergosbyt · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2025
- Renewable match
- 18%
- Rack density
- 20 kW
- PUE
- 1.301.00 ideal · 1.60 typical
- Power source
- MOESK / Mosenergosbyt. Dual 10 kV inlets plus on-site diesel. Gas-heavy Moscow grid; nuclear from Rosenergoatom on the ring.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
20 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus high-density cages to 55 kW. Cold-wall / contained-aisle. Liquid-ready on request.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Moscow, Moscow, Russia
Altufyevo, northern Moscow
55.907°, 37.589° · Europe
Tenants / users
Cloud, wholesale, AI colo
Notes
Greenfield North hall, 30 MW. Last of the original North campus build-out.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.