IXcellerate MOS11 Veshki
IXcellerate · Veshki
- Planned IT
- 130 MW
- Free to lease
- 130 MW
- $ / kW·mo
- $50
- White space
- 464k ft²
Inventory
0% occupiedPower
130 MWlive
130 MW to lease · 0 MW in use
White space
464k ft²total
464k ft² free · — occupied
43k m² · 43k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$50/kW·mo
5.6¢ industrial · 6.8¢ after PUE 1.22
- Per MW·year
- $598k
- This site · 130 MW
- $78M/yr
- 25 kW rack
- $1,247/mo
1.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $33M/yr less.
Mosenergosbyt · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2026
- Renewable match
- 18%
- Rack density
- 25 kW
- PUE
- 1.221.00 ideal · 1.60 typical
- Power source
- MOESK / Mosenergosbyt. Dual 10 kV inlets plus on-site diesel. Gas-heavy Moscow grid; nuclear from Rosenergoatom on the ring.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
25 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
High-density to 55 kW per rack without hall redesign. Cold-wall containment. Direct-to-chip options for AI cabinets.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Veshki, Moscow Oblast, Russia
Veshki, Moscow Oblast
55.926°, 37.608° · Europe
Tenants / users
Cloud, wholesale, AI pipeline
Notes
Third IXcellerate campus. 130 MW design. First 600 racks targeted summer 2026. CNews: the only operator still launching ~2,000 racks a year through 2025-26.