Operational
Colocation
Liquid cooling
Tier III

IXAfrica Nairobi

IXAfrica · Tatu City

IT live
10 MW
Free to lease
2.2 MW
$ / kW·mo
$154
White space
50k ft²

Inventory

78% occupied

Power

10 MWlive

2.2 MW to lease · 7.8 MW in use

White space

50k ft²total

11k ft² free · 39k ft² occupied

4,645 m² · 1,022 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live10 MW
Free to lease2.2 MW
Utility feed37.5 MW
Campus / planned30 MW

About 27.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$154/kW·mo

16.2¢ industrial · 21.1¢ after PUE 1.30

Per MW·year
$1.8M
This site · 10 MW
$18M/yr
15 kW rack
$2,306/mo
3.2¢ cheapdear 22.4¢

5.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $15M/yr less.

Kenya Power · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2022
Renewable match
20%
Rack density
15 kW
Voltage
PUE
1.301.00 ideal · 1.60 typical
Power source
Kenya Power (KPLC) plus on-site generators. Dual utility where available.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

15 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

3

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Nairobi, Kiambu, Kenya

Tatu City, Greater Nairobi

-1.100°, 36.880° · Africa

Tenants / users

Cloud, networks, enterprise, KIXP

Notes

Tatu City carrier-neutral campus. Designed to scale toward 30 MW. East Africa wholesale alternative to Karen.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.