IXAfrica Nairobi
IXAfrica · Tatu City
- IT live
- 10 MW
- Free to lease
- 2.2 MW
- $ / kW·mo
- $154
- White space
- 50k ft²
Inventory
78% occupiedPower
10 MWlive
2.2 MW to lease · 7.8 MW in use
White space
50k ft²total
11k ft² free · 39k ft² occupied
4,645 m² · 1,022 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 27.5 MW of the utility feed is cooling, conversion, and house load.
Power cost
$154/kW·mo
16.2¢ industrial · 21.1¢ after PUE 1.30
- Per MW·year
- $1.8M
- This site · 10 MW
- $18M/yr
- 15 kW rack
- $2,306/mo
5.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $15M/yr less.
Kenya Power · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2022
- Renewable match
- 20%
- Rack density
- 15 kW
- PUE
- 1.301.00 ideal · 1.60 typical
- Power source
- Kenya Power (KPLC) plus on-site generators. Dual utility where available.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
15 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
3Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Nairobi, Kiambu, Kenya
Tatu City, Greater Nairobi
-1.100°, 36.880° · Africa
Tenants / users
Cloud, networks, enterprise, KIXP
Notes
Tatu City carrier-neutral campus. Designed to scale toward 30 MW. East Africa wholesale alternative to Karen.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.