Operational
Crypto / HPC
Air cooled
Tier III

IREN Prince George

IREN · Prince George

IT live
50 MW
Remaining
0 MW
$ / kW·mo
$44
White space
260k ft²

Inventory

100% occupied

Power

50 MWcampus

0 MW to commission · 50 MW in use

White space

260k ft²total

— free · 260k ft² occupied

24k m²

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live50 MW
Remaining0 MW
Utility feed62.5 MW
Campus / planned50 MW

About 12.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$44/kW·mo

5.8¢ industrial · 6.1¢ after PUE 1.05

Per MW·year
$533k
This site · 50 MW
$27M/yr
20 kW rack
$889/mo
3.2¢ cheapdear 22.4¢

1.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $12M/yr less.

BC Hydro Peace / Kootenay · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2021
Renewable match
98%
Rack density
20 kW
PUE
1.051.00 ideal · 1.60 typical
Power source
BC Hydro interior 138/230 kV. Dual feeds. Mackenzie / Peace hydro.

Cooling

Plant

Free air

Liquid

Not deployed

Rack density

20 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Cool-climate free-air economization most of the year. Closed-loop dry coolers; no evaporative towers.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Prince George, British Columbia, Canada

Prince George, BC

53.917°, -122.749° · North America

Tenants / users

Bitcoin self-mining

Notes

Interior BC hydro. Dual-site with Mackenzie and Canal Flats. Not a Lower Mainland colo hall.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.