Operational
Crypto / HPC
Air cooled
Tier III

IREN Mackenzie

IREN · Mackenzie

IT live
80 MW
Remaining
0 MW
$ / kW·mo
$44
White space
417k ft²

Inventory

100% occupied

Power

80 MWcampus

0 MW to commission · 80 MW in use

White space

417k ft²total

— free · 417k ft² occupied

39k m²

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live80 MW
Remaining0 MW
Utility feed100 MW
Campus / planned80 MW

About 20 MW of the utility feed is cooling, conversion, and house load.

Power cost

$44/kW·mo

5.8¢ industrial · 6.1¢ after PUE 1.05

Per MW·year
$533k
This site · 80 MW
$43M/yr
20 kW rack
$889/mo
3.2¢ cheapdear 22.4¢

1.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $19M/yr less.

BC Hydro Peace / Kootenay · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2020
Renewable match
98%
Rack density
20 kW
PUE
1.051.00 ideal · 1.60 typical
Power source
BC Hydro interior 138/230 kV. Dual feeds. Mackenzie / Peace hydro.

Cooling

Plant

Free air

Liquid

Not deployed

Rack density

20 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Cool-climate free-air economization most of the year. Closed-loop dry coolers; no evaporative towers.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Mackenzie, British Columbia, Canada

Mackenzie, BC

55.333°, -123.094° · North America

Tenants / users

Bitcoin self-mining, IREN Cloud overflow

Notes

Peace-region hydro. Part of IREN's 160 MW Canadian book (Mackenzie, Prince George, Canal Flats). Canadian expansion slowing as Childress TX 750 MW takes the AI contract.

Operator site