IREN Canal Flats
IREN · Canal Flats
- IT live
- 30 MW
- Remaining
- 0 MW
- $ / kW·mo
- $44
- White space
- 167k ft²
Inventory
100% occupiedPower
30 MWcampus
0 MW to commission · 30 MW in use
White space
167k ft²total
— free · 167k ft² occupied
16k m²
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 7.5 MW of the utility feed is cooling, conversion, and house load.
Power cost
$44/kW·mo
5.8¢ industrial · 6.1¢ after PUE 1.05
- Per MW·year
- $533k
- This site · 30 MW
- $16M/yr
- 18 kW rack
- $800/mo
1.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $7.2M/yr less.
BC Hydro Peace / Kootenay · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2022
- Renewable match
- 98%
- Rack density
- 18 kW
- PUE
- 1.051.00 ideal · 1.60 typical
- Power source
- BC Hydro interior 138/230 kV. Dual feeds. Mackenzie / Peace hydro.
Cooling
Plant
Free air
Liquid
Not deployed
Rack density
18 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Cool-climate free-air economization most of the year. Closed-loop dry coolers; no evaporative towers.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Canal Flats, British Columbia, Canada
Canal Flats, BC
50.244°, -115.937° · North America
Tenants / users
Bitcoin self-mining
Notes
East-Kootenay hydro. Smallest of the three IREN BC sites. Completes the 160 MW Canadian footprint.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.