Meta Hyperion
Meta · Richland Parish
- Planned IT
- 5 GW
- Remaining
- 5 GW
- $ / kW·mo
- $63
- White space
- 10M ft²
Inventory
0% occupiedPower
5 GWcampus
5 GW pipeline · 0 MW in use
White space
10M ft²total
10M ft² free · — occupied
929k m² · 929k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
Power cost
$63/kW·mo
8¢ industrial · 8.6¢ after PUE 1.08
- Per MW·year
- $757k
- This site · 5 GW
- $3.8B/yr
- 200 kW rack
- $12,614/mo
2.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $2.3B/yr less.
US industrial · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2028
- Renewable match
- 100%
- Rack density
- 200 kW
- PUE
- 1.081.00 ideal · 1.60 typical
- Power source
- Entergy Louisiana plus on-site generation.
Cooling
Plant
Direct-to-chip
Liquid
Deployed
Rack density
200 kW
H100-eq
—
WUE
0.18 L/kWh
fleet avg · 2023 · 7.9M m³/yr at 5 GW
Operator fleet average applied to this hall — not a site meter. Meta 2023 Sustainability Report.
Purpose-built for next-generation liquid-cooled AI racks. 5 GW end-state campus.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Rayville, Louisiana, United States
Richland Parish, LA
32.464°, -91.755° · North America
Tenants / users
Meta
Notes
One of the largest planned single-campus AI factories in the United States.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.