Under construction
Hyperscale
Liquid cooling
Tier IV

Meta Hyperion

Meta · Richland Parish

Planned IT
5 GW
Remaining
5 GW
$ / kW·mo
$63
White space
10M ft²

Inventory

0% occupied

Power

5 GWcampus

5 GW pipeline · 0 MW in use

White space

10M ft²total

10M ft² free · occupied

929k m² · 929k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live
Remaining5 GW
Utility feed
Campus / planned5 GW

Power cost

$63/kW·mo

industrial · 8.6¢ after PUE 1.08

Per MW·year
$757k
This site · 5 GW
$3.8B/yr
200 kW rack
$12,614/mo
3.2¢ cheapdear 22.4¢

2.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $2.3B/yr less.

US industrial · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2028
Renewable match
100%
Rack density
200 kW
PUE
1.081.00 ideal · 1.60 typical
Power source
Entergy Louisiana plus on-site generation.

Cooling

Plant

Direct-to-chip

Liquid

Deployed

Rack density

200 kW

H100-eq

WUE

0.18 L/kWh

fleet avg · 2023 · 7.9M m³/yr at 5 GW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Meta 2023 Sustainability Report.

Purpose-built for next-generation liquid-cooled AI racks. 5 GW end-state campus.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Rayville, Louisiana, United States

Richland Parish, LA

32.464°, -91.755° · North America

Tenants / users

Meta

Notes

One of the largest planned single-campus AI factories in the United States.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.