Expanding
Colocation
Liquid cooling
Tier III

Hydro66 Boden

Northern Data / Hydro66 · Boden

IT live
24 MW
Free to lease
2.9 MW
$ / kW·mo
$33
White space
208k ft²

Inventory

88% occupied

Power

24 MWlive

2.9 MW to lease · 21.1 MW in use

White space

208k ft²total

12k ft² free · 196k ft² occupied

19k m² · 1,115 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live24 MW
Free to lease2.9 MW
Utility feed50 MW
Campus / planned40 MW

About 26 MW of the utility feed is cooling, conversion, and house load.

Power cost

$33/kW·mo

4.2¢ industrial · 4.5¢ after PUE 1.07

Per MW·year
$394k
This site · 24 MW
$9.4M/yr
20 kW rack
$656/mo
3.2¢ cheapdear 22.4¢

1.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $2.2M/yr less.

Sweden SE1 · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2015
Renewable match
100%
Rack density
20 kW
PUE
1.071.00 ideal · 1.60 typical
Power source
Svenska kraftnät SE1. Luleå / Boden hydro. Dual 130 kV feeds.

Cooling

Plant

Free air

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Nordic free-air economization most of the year. Closed-loop dry coolers; no evaporative towers.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

3

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Boden, Norrbotten, Sweden

Hydrogrand 2, 961 43 Boden

65.825°, 21.689° · Europe

Tenants / users

HPC, AI colo, former bitcoin

Notes

Node Pole hall next to Meta Luleå. Six buildings on 2.5 ha. Arctic free-air, PUE near 1.07. Northern Data conversion from mining to HPC.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.