Hut 8 Medicine Hat
Hut 8 · Medicine Hat
- IT live
- 67 MW
- Remaining
- 0 MW
- $ / kW·mo
- $54
- White space
- 419k ft²
Inventory
100% occupiedPower
67 MWcampus
0 MW to commission · 67 MW in use
White space
419k ft²total
— free · 419k ft² occupied
39k m²
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 16.8 MW of the utility feed is cooling, conversion, and house load.
Power cost
$54/kW·mo
6.8¢ industrial · 7.3¢ after PUE 1.08
- Per MW·year
- $643k
- This site · 67 MW
- $43M/yr
- 15 kW rack
- $804/mo
2.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $23M/yr less.
Medicine Hat municipal / AESO · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2018
- Renewable match
- 20%
- Rack density
- 15 kW
- PUE
- 1.081.00 ideal · 1.60 typical
- Power source
- City of Medicine Hat municipal utility / AESO. Dual feeds. Gas-city industrial rate.
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
15 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Chilled-water CRAH, N+1. Canadian free-air hours most of the year. Not an AI factory unless noted.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Medicine Hat, Alberta, Canada
Medicine Hat, AB
50.041°, -110.677° · North America
Tenants / users
Bitcoin self-mining, high-performance compute overflow
Notes
Municipal-utility Bitcoin campus in Alberta's gas city. Hut 8 also absorbed TeraGo colo. Not Hydro-Québec — AESO/gas.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.