Operational
Crypto / HPC
Air cooled
Tier III

Hut 8 Medicine Hat

Hut 8 · Medicine Hat

IT live
67 MW
Remaining
0 MW
$ / kW·mo
$54
White space
419k ft²

Inventory

100% occupied

Power

67 MWcampus

0 MW to commission · 67 MW in use

White space

419k ft²total

— free · 419k ft² occupied

39k m²

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live67 MW
Remaining0 MW
Utility feed83.8 MW
Campus / planned67 MW

About 16.8 MW of the utility feed is cooling, conversion, and house load.

Power cost

$54/kW·mo

6.8¢ industrial · 7.3¢ after PUE 1.08

Per MW·year
$643k
This site · 67 MW
$43M/yr
15 kW rack
$804/mo
3.2¢ cheapdear 22.4¢

2.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $23M/yr less.

Medicine Hat municipal / AESO · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2018
Renewable match
20%
Rack density
15 kW
PUE
1.081.00 ideal · 1.60 typical
Power source
City of Medicine Hat municipal utility / AESO. Dual feeds. Gas-city industrial rate.

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

15 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Chilled-water CRAH, N+1. Canadian free-air hours most of the year. Not an AI factory unless noted.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Medicine Hat, Alberta, Canada

Medicine Hat, AB

50.041°, -110.677° · North America

Tenants / users

Bitcoin self-mining, high-performance compute overflow

Notes

Municipal-utility Bitcoin campus in Alberta's gas city. Hut 8 also absorbed TeraGo colo. Not Hydro-Québec — AESO/gas.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.