Hut 8 Drumheller
Hut 8 · Drumheller
- IT live
- 42 MW
- Remaining
- 0 MW
- $ / kW·mo
- $54
- White space
- 263k ft²
Inventory
100% occupiedPower
42 MWcampus
0 MW to commission · 42 MW in use
White space
263k ft²total
— free · 263k ft² occupied
24k m²
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 10.5 MW of the utility feed is cooling, conversion, and house load.
Power cost
$54/kW·mo
6.8¢ industrial · 7.3¢ after PUE 1.08
- Per MW·year
- $643k
- This site · 42 MW
- $27M/yr
- 15 kW rack
- $804/mo
2.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $14M/yr less.
AESO Drumheller · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2018
- Renewable match
- 20%
- Rack density
- 15 kW
- PUE
- 1.081.00 ideal · 1.60 typical
- Power source
- ENMAX / AESO. Dual feeds plus on-site diesel. Gas-marginal Alberta grid.
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
15 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Chilled-water CRAH, N+1. Canadian free-air hours most of the year. Not an AI factory unless noted.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Drumheller, Alberta, Canada
Drumheller, AB
51.464°, -112.710° · North America
Tenants / users
Bitcoin self-mining
Notes
42 MW ASIC campus. Pair to Medicine Hat 67 MW already in the index. Municipal/AESO gas, not Hydro-Québec. Hut 8's second Alberta miner.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.