Huawei Horinger Cloud
Huawei Cloud · Horinger
- IT live
- 200 MW
- Remaining
- 100 MW
- $ / kW·mo
- $58
- White space
- 500k ft²
Inventory
67% occupiedPower
300 MWcampus
100 MW to commission · 200 MW in use
White space
750k ft²total
250k ft² free · 500k ft² occupied
70k m² · 23k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 50 MW of the utility feed is cooling, conversion, and house load.
Power cost
$58/kW·mo
6.4¢ industrial · 8¢ after PUE 1.25
- Per MW·year
- $701k
- This site · 200 MW
- $140M/yr
- 40 kW rack
- $2,336/mo
2.0× the cheapest market (Iceland Landsvirkjun). Same IT load there is $70M/yr less.
Inner Mongolia industrial · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2017
- Renewable match
- 50%
- Rack density
- 40 kW
- PUE
- 1.251.00 ideal · 1.60 typical
- Power source
- Inner Mongolia grid plus wind.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
40 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Cold-climate free cooling plus liquid loops for Ascend AI clusters.
Network carriers
3On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Hohhot, Inner Mongolia, China
Horinger County, Hohhot, Inner Mongolia
40.872°, 111.806° · Asia
Tenants / users
Huawei Cloud, government
Notes
Largest publicly identified Chinese AI campus in the Epoch AI directory.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.