Operational
Hyperscale
Liquid cooling
Tier III

Huawei Horinger Cloud

Huawei Cloud · Horinger

IT live
200 MW
Remaining
100 MW
$ / kW·mo
$58
White space
500k ft²

Inventory

67% occupied

Power

300 MWcampus

100 MW to commission · 200 MW in use

White space

750k ft²total

250k ft² free · 500k ft² occupied

70k m² · 23k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live200 MW
Remaining100 MW
Utility feed250 MW
Campus / planned300 MW

About 50 MW of the utility feed is cooling, conversion, and house load.

Power cost

$58/kW·mo

6.4¢ industrial · 8¢ after PUE 1.25

Per MW·year
$701k
This site · 200 MW
$140M/yr
40 kW rack
$2,336/mo
3.2¢ cheapdear 22.4¢

2.0× the cheapest market (Iceland Landsvirkjun). Same IT load there is $70M/yr less.

Inner Mongolia industrial · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2017
Renewable match
50%
Rack density
40 kW
PUE
1.251.00 ideal · 1.60 typical
Power source
Inner Mongolia grid plus wind.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

40 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Cold-climate free cooling plus liquid loops for Ascend AI clusters.

Network carriers

3

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Hohhot, Inner Mongolia, China

Horinger County, Hohhot, Inner Mongolia

40.872°, 111.806° · Asia

Tenants / users

Huawei Cloud, government

Notes

Largest publicly identified Chinese AI campus in the Epoch AI directory.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.