HIVE Lachute
HIVE Digital · Canada 1.0
- IT live
- 34.5 MW
- Remaining
- 0 MW
- $ / kW·mo
- $37
- White space
- 192k ft²
Inventory
100% occupiedPower
34.5 MWcampus
0 MW to commission · 34.5 MW in use
White space
192k ft²total
— free · 192k ft² occupied
18k m²
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 8.6 MW of the utility feed is cooling, conversion, and house load.
Power cost
$37/kW·mo
4.8¢ industrial · 5¢ after PUE 1.05
- Per MW·year
- $442k
- This site · 34.5 MW
- $15M/yr
- 18 kW rack
- $662/mo
1.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $5.1M/yr less.
Hydro-Québec Rate L / Townships · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2018
- Renewable match
- 99%
- Rack density
- 18 kW
- PUE
- 1.051.00 ideal · 1.60 typical
- Power source
- Hydro-Québec. Dual MV inlets plus on-site diesel. ~99.8 percent hydro (Rate L on large sites).
Cooling
Plant
Free air
Liquid
Not deployed
Rack density
18 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Cool-climate free-air economization most of the year. Closed-loop dry coolers; no evaporative towers.
Network carriers
7On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Lachute, Quebec, Canada
963 Chemin Béthany, Lachute, QC J8H 2C5
45.650°, -74.341° · North America
Tenants / users
Bitcoin self-mining, BUZZ HPC overflow
Notes
Leased Hydro-Québec hall ~4 ¢/kWh. 34.5 MW. Laurentides, not Montréal interconnection. Pair to Grand Falls NB for HIVE's Canadian ASIC book.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.