HIVE BUZZ GTA Gigafactory
HIVE Digital · GTA
- Planned IT
- 320 MW
- Remaining
- 320 MW
- $ / kW·mo
- $85
- White space
- 640k ft²
Inventory
0% occupiedPower
320 MWcampus
320 MW pipeline · 0 MW in use
White space
640k ft²total
640k ft² free · — occupied
59k m² · 59k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
Power cost
$85/kW·mo
10.6¢ industrial · 11.7¢ after PUE 1.10
- Per MW·year
- $1M
- This site · 320 MW
- $327M/yr
- 80 kW rack
- $6,809/mo
3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $228M/yr less.
Toronto Hydro / IESO · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2027
- Renewable match
- 80%
- Rack density
- 80 kW
- PUE
- 1.101.00 ideal · 1.60 typical
- Power source
- Toronto Hydro / Hydro One / IESO. Dual feeds plus on-site diesel. Nuclear-plus-hydro Ontario mix.
Cooling
Plant
Direct-to-chip
Liquid
Deployed
Rack density
80 kW
H100-eq
24k
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Direct-to-chip cold plates and rear-door HX. Designed for 40 kW-plus AI racks.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Toronto, Ontario, Canada
Greater Toronto (campus undisclosed)
43.780°, -79.480° · North America
Tenants / users
BUZZ HPC, University of Toronto / Vector Institute partnership, Canadian AI
Notes
320 MW utility AI campus, H2 2027 target, ~C$2.55 billion. HIVE cites land and power for ~130,000 GPUs across Grand Falls + GTA. North-GTA pipeline alongside Microsoft Markham 112 MW and Yondr TOR1. IESO, not Rate L.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.