GreenSquareDC SYD1
GreenSquareDC · Western Sydney
- Planned IT
- 96 MW
- Free to lease
- 76.8 MW
- $ / kW·mo
- $122
- White space
- 240k ft²
Inventory
20% occupiedPower
96 MWlive
76.8 MW to lease · 19.2 MW in use
White space
240k ft²total
192k ft² free · 48k ft² occupied
22k m² · 18k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$122/kW·mo
14.2¢ industrial · 16.8¢ after PUE 1.18
- Per MW·year
- $1.5M
- This site · 96 MW
- $141M/yr
- 40 kW rack
- $4,893/mo
4.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $109M/yr less.
NSW NEM · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2027
- Renewable match
- 80%
- Rack density
- 40 kW
- PUE
- 1.181.00 ideal · 1.60 typical
- Power source
- Endeavour Energy.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
40 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
96 MW Stage 2, AI-ready liquid cooling.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Sydney, New South Wales, Australia
Western Sydney, NSW
-33.820°, 150.840° · Oceania
Tenants / users
Hyperscale, AI
Notes
Western Sydney neocloud/wholesale campus. Stage 2 endorsed at 96 MW.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.