Under construction
Colocation
Liquid cooling
Tier III

GreenSquareDC SYD1

GreenSquareDC · Western Sydney

Planned IT
96 MW
Free to lease
76.8 MW
$ / kW·mo
$122
White space
240k ft²

Inventory

20% occupied

Power

96 MWlive

76.8 MW to lease · 19.2 MW in use

White space

240k ft²total

192k ft² free · 48k ft² occupied

22k m² · 18k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease76.8 MW
Utility feed
Campus / planned96 MW

Power cost

$122/kW·mo

14.2¢ industrial · 16.8¢ after PUE 1.18

Per MW·year
$1.5M
This site · 96 MW
$141M/yr
40 kW rack
$4,893/mo
3.2¢ cheapdear 22.4¢

4.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $109M/yr less.

NSW NEM · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2027
Renewable match
80%
Rack density
40 kW
PUE
1.181.00 ideal · 1.60 typical
Power source
Endeavour Energy.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

40 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

96 MW Stage 2, AI-ready liquid cooling.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Sydney, New South Wales, Australia

Western Sydney, NSW

-33.820°, 150.840° · Oceania

Tenants / users

Hyperscale, AI

Notes

Western Sydney neocloud/wholesale campus. Stage 2 endorsed at 96 MW.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.