Greenhouse Datacenters Naaldwijk
Greenhouse Datacenters · Westland
- IT live
- 12 MW
- Free to lease
- 1.1 MW
- $ / kW·mo
- $127
- White space
- 142k ft²
Inventory
91% occupiedPower
12 MWlive
1.1 MW to lease · 10.9 MW in use
White space
142k ft²total
6,136 ft² free · 136k ft² occupied
13k m² · 570 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 13 MW of the utility feed is cooling, conversion, and house load.
Power cost
$127/kW·mo
15¢ industrial · 17.4¢ after PUE 1.16
- Per MW·year
- $1.5M
- This site · 12 MW
- $18M/yr
- 12 kW rack
- $1,524/mo
4.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $14M/yr less.
Rotterdam / Stedin · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2014
- Renewable match
- 100%
- Rack density
- 12 kW
- PUE
- 1.161.00 ideal · 1.60 typical
- Power source
- TenneT / Liander. Dual MV inlets plus on-site diesel. Dutch wind-plus-gas mix; DDA halls buy 100 percent certified green power.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
12 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Closed-loop plus waste-heat to adjacent Westland greenhouses.
Network carriers
10On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Naaldwijk, South Holland, Netherlands
Naaldwijk, Westland
51.994°, 4.206° · Europe
Tenants / users
Enterprise, cloud, horticulture heat reuse
Notes
Westland heat-reuse colo. Dual-site option with Switch AMS8 pipeline. Not Amsterdam Liander.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.